1
/
of
2
Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy
- Regular price
-
$17.99 - Regular price
-
$45.00 - Sale price
-
$17.99
Description:
- LIGHTWEIGHT AND NOT ABSORB WATER- Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background
- GREAT DESIGN- The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off
- LONG DOG LEAD- Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs
Brand Name: STEVVEX Pets
Model Number: ST12DB786GBI
Type: Leashes
Dog Leash Type: Basic Leashes
Material: Nylon
Type: Dogs
Season: All seasons
Pattern: Solid
Feature: Personalized
Feature: outdoor training dog leash rope
Use for: puppy, small medium and large dog belt
Use for 1: training, running dog lead
Shipping information
- No EU import duties.
- Ships within 1-2 business days.
- Ships in our fully recyclable and biodegradable signature boxes.
Couldn't load pickup availability







Pet Leashes Rope Outdoor Training Running Dog Leash Belt Dogs Lead For Small And Large Dog Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy
- Regular price
-
$17.99 - Regular price
-
$45.00 - Sale price
-
$17.99
FREE SHIPPING on all orders over $100
EASY RETURNS 30-day postage paid returns
10% OFF your first order | Use code: FIRST10

